19-27 Young St comprises of an eight storey frame (seven levels plus ground floor) along with a watertight basement. The site is bounded on three sides by existing properties. The bulk dig involved the removals of ACM. GCL used a thrust block and steel propping scheme to support the surrounding building while the basement was dug out. GCL used a mixture of temporary gantries to provide access into the job due to its restrictive nature.
Construction Features
- 1No. Concrete Frame
- Complex Enabling works Package
- Removal of existing foundations using drill and burst technique
- Power Floated basement slab
- One-sided wall construction in basement with a .
- Drainage & services including connection to Live Outfall Sewer.
Innovation
- Assistance with design, planning, muck strategy and constructability during pre-contract stage.
- Temporary works solution to basement dig using thrust block and propping scheme
- Specialist advice and assistance in the removal of ACMs off site.
- Introduction and use of Precast columns and stairs to accelerate the programme.
- Use of MGF frames and sheet piles to construct attenuation tank and crane base, up to 6m deep.
- Detailed planning of works using ASTA programmes.