Abbey Road Phase 3- Wates

Location

Kilburn

Services we provided

Concrete frames icon

Concrete frames

Ground works icon

Groundworks

Tower crane icon

Tower cranes

Value

£8.7m

Description

Demolition works completed late 2023 at Phase 3 of the Abbey Road scheme for Wates. Enabling works for scheme are currently ongoing with RC groundworks due to commence Feb 2023. The final phase of the scheme will consist of 3no blocks ranging from 6 to 11 floors. 2no tower cranes will service the job which will be served from a new pitlane for all deliveries due to the tight site logistics. Precast Columns and stairs will be installed as the frames progress which will help reduce the number of deliveries to the site. These will be designed and supplied by PCUK and installed on site by experienced operatives.

Construction Features

  • Pre-Cast Columns
  • Pre-Cast Stairs
  • 2no Tower Cranes