Skip to content
< All projects

Chelsea Creek

Location

Fulham

Services we provided

Concrete frames icon

Concrete frames

Ground works icon

Groundworks

Tower crane icon

Tower cranes

Value

£9.6m

Description

The project involved the construction of a large basement carpark and Ground floor podium slab with a seven story RC frame including 2no cores. Bamtec reinforcement was our preferred reinforcement option from podium level to roof which proved to be both economical and a programme enhancing method. Precast columns constructed in our own precast yard proved beneficial to both our programme and reduced our work load on site quite substantially. All precast stairs were installed as we progressed with the frame which provided access to all floors below our live decks.

Construction Features

  • One-sided wall construction in basement.
  • Drainage & services
  • Precast Columns & Stairs
  • Bamtec Reinforcement
  • Just in time deliveries

Innovation

  • Temporary works solution to deep drainage and basement dig.
  • In-house design of cyclical falsework and formwork system to reduce plant costs.
  • Introduction and use of Precast columns and stairs to accelerate the programme to compensate for client delays.